Projects
Electronic Arts expansion project (Gilmore at Sanderson Way)
- On site from March 2004 to April 2006
- General Contractor: PCL Ltd
- Retained when conventional systems did not satisfactorily address high discharge turbidity
- Blue clay type till encountered
- No site downtime after system installation
Vancouver General Hospital (12th Avenue at Oak Street)
- On site from December 2004 to May 2005
- General Contractor: PCL Ltd
- Retained from the onset to address challenges presented by this very deep excavation project
- Highly visible site with significant political interest
- No site downtime after system installation
Vancouver Convention Centre Project (Adjacent to the Pan Pacific Hotel)
- On site from October 2005 to June 2006
- General Contractor: PCL Ltd
- Retained when competitor did not satisfactorily address high discharge turbidity
- High profile environmentally sensitive site
- No site downtime after system installation
200th Street/Golden Ears Bridge Project
- On site from May 2006 to April 2007
- General Contractor: Bilfinger Berger
- Retained from the onset to address challenges initially presented by the test piles required for this megaproject
- High profile environmentally sensitive site
- No site downtime after system installation
- This was a complex treatment system with removal of toxic vinyl chloride. We used our patented technology to remove toxic organics while managing the DO (dissolved oxygen) for aquatics.
- Ideal DO range is 7 to 12 mg/L
- Bioreactor is liquid incineration technology with an automatic feedback system to control the DO of the water
Shangri-La Project (downtown Vancouver)
- Retained by the developer
- General Contractor: Ledcor
- Retained when competitor did not satisfactorily address high discharge turbidity
- Highest tower in Vancouver
- 80, 000 cubic metres of material excavated
- No site downtime after system installation
Olympic Village Project
- On site from February 2007 to October 2008
- General Contractor: Metrocan Construction
- Retained from the onset to address challenges initially presented by soil conditions at this megaproject
- Heavy metal concerns (over 100 years of industrial use), very fine till material
- High profile environmentally sensitive site
- Effluent water quality held to drinking water standards
- Daily testing (including LC 50's)
- No site downtime after system installation
Olympic Village Project
- This project utilized new patent pending technology to remove toxic levels of surfactants
- The site was a past practice site for ship building, painting and plating
- The soils were hazardous by Environment Canada requiring secure disposal
- System was designed to remove heavy metals, hydrocarbons, TSS and toxic organic compounds
- Tested daily for all parameters to less than 0.01 ppm
- Tested weekly on LC50 fish bioassay
- Treatment Standards:
- 8 NTV
- 10 mg/L TSS
- ND on metals
- Passing LC 50
- Treated water complied with City of Vancouver drinking water standards
Still Creek Drive (Slough Estates) at Willingdon Avenue
- On site from May 2008 to October 2009
- General Contractor: Stuart Olson
- Retained from the onset to address challenges presented by the proximity to Still Creek coupled by the ground conditions (peat concerns and hog fuel contaminants)
- High profile environmentally sensitive site
- No site downtime after system installation
Metrotower 3 (Metrotown, Burnaby)
- On site from 2008 to present
- General Contractor: Ledcor
- Retained from the onset to address challenges relating to this megaproject
- Highly visible site
- No site downtime after system installation
|
|